| |
Galliford Try - Northampton School for Girls, Northampton

| Brickwork LPM |
£1,500,000.00 |
| Scaffold |
£420,000.00 |
- Built in two phases to ensure school still operational for students to use as the construction as carried out.
- Build consisted of 7 standalone buildings including a sports hall, and an additional building incorporated as an extension to an existing block.
- Metsec frame construction with brickwork outer leaf - Ibstock priory red facing brick
Return to previous page... |
|